Verification scope and caveats
Al Zawra 2.6GW power project: turbine reservation and EPC watch
CountryUAE
SectorEnergy & Water
Current stageMonitoring · main EPC status unverified
Procurer / clientEtihad Water and Electricity (EtihadWE) · Ajman
Value and basisProject budget and main EPC value not publicly verified
Deadline noteNo current official main EPC deadline verified as of 8 October 2026.
International eligibilityEtihadWE requires vendor self-registration, with additional prequalification for some products and services. This does not itself establish eligibility for the Al Zawra EPC competition. Obtain the latest owner-issued RFP and addenda through the official vendor channel before preparing a bid.
Evidence checked2026-10-08 — EtihadWE turbine-reservation announcement and vendor requirements checked; current main EPC access and deadline not verified
Tender referenceAl Zawra CCGT project; current EPC tender reference not publicly verified
Source noticeRead the source notice or report
Project summary
EtihadWE has reserved Siemens Energy gas and steam turbines for its planned Al Zawra combined-cycle power project in Ajman. The approximately 2.6GW development remains a substantial EPC and equipment supply-chain project to monitor.
What to watch
Watch for the main EPC selection, an owner-confirmed construction programme and package-specific supplier enquiries. Check current procurement documents before treating any package as available.
Evidence and access caveats
EtihadWE's September 2026 announcement supports the turbine reservation. It does not establish that the main EPC tender is currently open. No official live EPC deadline or contract value was verified.