Reported development
United Arab Emirates · Oil & Gas
Mannesmann Energy says it will sign with ADNOC on NEB CPP upgrades at Nouf, Rumaitha and Shanayel, WAM reports
Mannesmann Energy, a UAE engineering, procurement and construction (EPC) company, has unveiled a new project with ADNOC to develop existing facilities and raise production capacity at ADNOC’s NEB CPP assets in Nouf, Rumaitha and Shanayel, the Emirates News Agency (WAM) reported on 3 November 2026. The company said at ADIPEC 2026 that it intends to sign an agreement to execute the project.
Chief executive Anas Al Juaidi told WAM the project aims to reach the required production capacity and improve asset integrity and operational flexibility. He said meetings during the exhibition with ADNOC and energy operators covered the steps to execute the NEB CPP project.
Not confirmed: the agreement had not been signed when reported, and no contract value, scope split, timetable or ADNOC group company was named. This is the contractor’s own statement; no ADNOC announcement has been seen.
Sources: WAM (Arabic), 3 November 2026. Reviewed 4 November 2026.